Hello. Trying to figure out which metal building company is the best for the money. Including financing, and installation. I'm now retired at 55 by disability. I can do a little but I have to take it easy, so I been wanting a small garage with room for a lift. I will be staring dirt work soon, and have a guy ready to do the concrete work. What i need is recommendations on a metal building supplier/ installer that also does financing. I have a limited amount of cash to work with so financing is a must. The biggest I can afford is the plan. I'm hoping to have enough room for a 30 deep by 40 long. Two 10 x 10 doors in the front with a man door on the side. Any help would be appreciated.
I am having a 24x64 built by American Steel Carports.
 
Currently fabricating a new hayshed . Outside footprint will be 87 x 184.5 (84 x 184 centre to centre on the footings). Got the footings poured a few weeks ago now. I finished off the trusses (I think) yesterday and are now sitting here looking at a heap of steel beams I need to drill and dress.
doing it in my 80x40 workshop. Squeezing 46 foot clearspan trusses through a 20 foot door was fairly easy after doing the same with the 18 42 foot roof trusses.
It's a massive job on your own. 12hr days 7 days a week. I enjoy the engineering challenge. Not sure if I'll enjoy putting it up as much.
 
It's 32 foot to the top. I made an adaptor to lift my man basket another 4 feet higher.
Image

That was after making a lifting attachment for the forks to put the trusses up with Its bolted to the back of the adjustable forks. Meaning I had another 3 feet of lifting height , plus the forks have sideshift.
Image

Best thing I've ever made was those forks.
 
Diddle, often I find reading your posts makes me feel really tired and inadequate. I suspect you snarfed some of that English biotech and cloned yourself 20x. Also lust after your shop tools!😎
 
That's very impressive. Usually takes a crew of 3 or 4 men to build them and that is after someone else manufactured it.
It's been 12 to 13hr days , 7 days a week for 2.5 months solid. At the end of most days I'm totally stuffed. Did 44 8 inch roof purlins yesterday plus 40 purlin braces. Should just about finish the majority of the roof structure tomorrow. Been pushing hard to get done what I can as it's not far off silage season here.
 
Upper Midwest US we are cutting corn silage now. Central states are starting combining corn and soybeans. Are you talking about corn silage?
 
That is an impressive project. I hope it serves you well for your lifetime and beyond.
 